The India Energy Stack moment
The meters are going in. The decisions aren't coming out.
India has sanctioned more than 20 crore smart meters. Senior DISCOM officials say even advanced utilities use less than a quarter of the data. Sutra is the layer that turns that data into decisions your regulator can audit.
Quoted: Ministry of Power / PIB releases and RDSS scheme documents.
Sanctioned counts, not installed.
What Sutra is
The utility intelligence platform for the India Energy Stack.
One layer between a utility's data and its decisions. It reads the systems you already run and answers with the evidence attached.
silos in · one semantic model · decisions out — with a refusal when the data can't carry the answer
Pulse · revenue & loss
Today Power delivered but never billed simply vanishes — found by hunch, months late.
The future The grid audits itself, continuously. Every unit accounted for; loss surfaces the day it starts.
How we get there A worklist ranked worst-first, the case attached, field outcomes retraining the model on your own network.
Atlas · smart-grid intelligence
Today Transformers fail unseen. Planning runs on stale single-line diagrams and gut feel.
The future A grid that sees itself — every asset watched, failures predicted, every capex rupee placed by physics.
How we get there Load flow on your real topology, agents watching thermal stress, spend ranked by re-solved loss reduction.
Proof · compliance MRV & disclosure
Today Clean-energy claims live in spreadsheets. Disclosure season is a scramble of unverifiable numbers.
The future Claims that verify themselves — disclosure compiled from the meter up, evidence attached, ready for scrutiny.
How we get there MRV reconciled against metered reality, drafts grounded in reproducible figures, a human sign-off always.
live today
Two surfaces run on India's published data right now. The rest is wired and waiting on your feed, and we publish which is which.
See it live → The readiness map →The decade ahead
A fifth of humanity gets a smarter grid this decade. We intend to build its intelligence.
Start with a paid pilot. If the after isn't better than the before, we refund you.