Answers that hold up when a regulator asks where they came from.
Any model can produce a number. A contested filing also needs the record, formula and inputs behind it. Sutra keeps those with every answer.
Shows its working
Every answer carries its formula, inputs and source row. With nothing to ground it, Sutra says so.
Uses the regulator's terms
The Integrated Rating, the energy account, the tariff order.
Built to the national standard
We build to the schemas India is publishing for this data.
Runs on your hardware
Every component runs inside your boundary, and your data stays there. How that works.
What the buyer asked for
When REC invited proposals for regulatory data exchange and for policy as code, its criteria included source-linked outputs, auditability and traceability, provenance and versioning, deterministic execution, golden test cases and regression testing, and auditable trace logs. Sutra already had those properties.
Every figure shows its tier
A surface waiting on your feed says so, and shows no stand-in number.
Computed on your data, or on India's published data.
Computed from a stated assumption instead of a measurement.
Shows what the capability looks like, and is labelled so.
Reserved for a model running entirely inside your boundary. Roadmap.
Data residency is now a rule
The CEA cyber security regulations, notified 31-Jul-2026 and in force from 1-Apr-2027, require sensitive data, including cloud and historical data, to be stored encrypted and kept in India (regulation 5(19)). They cover every distribution licensee. The 50 MW threshold applies only to generating companies, captive plants and storage.
The draft National Electricity Policy 2026, not yet notified, also calls for power-sector data to be stored in India, domestic software for critical applications, and single-digit AT&C losses. Running inside your boundary with the language-model call off, Sutra meets the residency clause. Pulse works on the AT&C loss the draft targets.
Start with a paid pilot.
One zone, with a measure we agree on day one. If the result is not better, we refund the fee. After the pilot, the license is a flat fee per utility, whatever your meter count.