What runs today, and what needs your data.
Every Sutra surface, its current status, and what it needs to go further.
Every surface
Sutra internal identifiers
liveMint, validate and resolve Sutra's own consumer, asset and transaction numbers. They are not India Energy Stack identifiers.
India Energy Stack identity
plannedDecentralised identifiers (W3C DIDs): did:web for organisations and assets, did:key for consumers, registry-backed. Not built yet.
A reachable India Energy Stack directory, and issuer keys.
Consent
liveConsent grant and revocation, on the DEPA pattern. A grant allows consented ingest at once.
Ratings and scheme readiness
livePublished utility ratings and scheme readiness, on India's public data.
AMI and smart-meter ingestion
readyWired and conformance-tested across eight vendor formats plus DLMS/COSEM OBIS.
A DISCOM AMI or HES feed, by CSV or signed webhook.
Theft and commercial-loss AI
syntheticScoring, ranking and the outcome loop are built. The model trains on synthetic data until your history arrives.
Anonymised meter and billing history with inspection outcomes. It retrains on upload.
Demand and load forecasting
modelledA deterministic model with uncertainty bands.
Historical interval demand, for forecasts beyond the current short window.
Network digital twin
demoLoad flow runs on a bundled reference network, checked against a published test network.
Your GIS network model and SCADA telemetry.
Connecting a feed
Four steps. You can stop after any of them.
Take the sample pack
Example files in the exact shape we need. Nothing to install.
Run the validator
Our server-side checks, run on your machine first. It lists what would be rejected and why, before you share anything.
Get a conformance report
What parsed, what was rejected, and the reason for each rejection.
Go live
A surface moves from ready to live only when real data is flowing. The product decides this from the data, and nobody can set it by hand.
Sutra rejects bad readings and never fills gaps.
Rejected rows go to a queue with the reason, and you can correct and resend them.
Start with a paid pilot.
One zone, with a measure we agree on day one. If the result is not better, we refund the fee. After the pilot, the license is a flat fee per utility, whatever your meter count.